Begin with the project, not the product photo
Write down why you want a replacement: visible damage, an unavailable matching section, appearance, or a different specification. Ask the installer to separate essential corrective work from optional upgrades. A proposal should explain what problem the replacement addresses.
Record the space for professional verification
Clopay identifies headroom, sideroom and backroom as important clearance considerations. Headroom is the space above the opening; sideroom is the space beside it; backroom concerns the depth into the garage. Required clearances depend on the selected system, so obtain an installer’s confirmation rather than ordering from a generic dimension rule.
From a safe position, note visible ceiling obstructions, shelving and equipment near the opening. Do not dismantle hardware or climb on the door to measure. Ask the installer to verify dimensions and fitting requirements before you authorize a nonreturnable order.
Make one specification sheet
- Door manufacturer, model, size and construction.
- Finish, window design and privacy preferences.
- Insulation specification and included seals.
- Included tracks, hardware and opener arrangements.
- Removal, disposal, delivery and installation scope.
- Any electrical or building work quoted separately.
Resolve responsibility before the deposit
Ask who confirms the fit, who handles any property-specific approval inquiry, when the quote expires and what happens if the ordered item is delayed or cannot be installed as proposed. Confirm cancellation and return terms for custom or special-order items in writing.
Choose based on the complete proposal
Compare the same equipment and work across bids. Ask for a clear total, deposit and balance milestones, and the process for approving changes. A lower door-only price may exclude delivery or installation included in another quote. Keep optional work separately priced so you can make a deliberate choice.
First compare repair and replacement · Compare written estimates
Manufacturer reference
Clopay clearance FAQ, reviewed November 17, 2026. Use the instructions and installation requirements for the actual model; this planning checklist does not certify fit.